Most problems in masonry do not originate at the drawing table but in the coordination beforehand. This checklist runs through the points that must be fixed before work starts: what is being built, with what, under which conditions, and who supplies what.
The calculation follows these standards. You receive a calculation report in which the assumptions and the verification are traceable.
Provide the data, and we will calculate it and deliver the calculation report.