Pre-Construction Meeting Checklist

Most problems in masonry do not originate at the drawing table but in the coordination beforehand. This checklist runs through the points that must be fixed before work starts: what is being built, with what, under which conditions, and who supplies what.

When We Use This

  • The pre-construction meeting before masonry work begins
  • Handover between work preparation and the construction site
  • Recording agreements on reinforcement, movement joints and wall ties

Basis

  • NEN-EN 1996-2 (execution of masonry)

The calculation follows these standards. You receive a calculation report in which the assumptions and the verification are traceable.

See also the application: Masonry